SD-1000 User manual
Technical reference for SD-1000 User manual with 2 pages, 1 tables, searchable navigation and precise source-page references.
- Chapters
- 1
- Pages
- 2
- Language
- English
- Format

Complete web edition
The complete manual in one reading flow
Pages follow the exact source order. Searchable text is also available for every page.
Complete document
Pages 1 to 2
Source page
Page 1
SD-1000 (EN)
User Manual
1.1 Product description
Our SD-1000 sensors allow the measurement of the load level in large tonnage silos.
1.2 Elements for installing the SD-1000
Items included
(1) SD-1000 Sensor (2) Self-tapping screws
(3) Box cover 3 (4) Connector + PCB
(5) Box base (6) Nut 4 (7) Fitting
2 Items NOT included
Corrugated tube (Sold in meters separately) 5 1 Cell cable (Four-wire cable with mesh for connection between sensors. Sold separately in meters) Tool SD-1000 (Sold separately) 6 Tin and tin welder Wire stripper 7 1.3 Installation step by step
1 Installation of sensors The installation consists of embedding the sensors in the supports or legs of the silos, allowing the detection of micro-deformations produced in the structure due to the load. Pre-position the SD-1000 sensors to be used. To do this, it is necessary to use the specifi c tool for this sensor. The tool manual indicates how and where the sensors should be placed and the installation requirements.
Fixing the base of the box Once the sensors are installed, you must place the base of the box, pulling the SD-1000 sensor cable through the central hole. Put the washers on the self-tapping screws and fi x the box with them.
| 1 Installation of sensors The installation consists of embedding the sensors in the supports or le of the silos, allowing the detection of micro-deformations produced in structure due to the load. Pre-position the SD-1000 sensors to be used. To do this, it is necessary to use the specifi c tool for this sensor. The too manual indicates how and where the sensors should be placed and the installation requirements. | Column | Column | gs the l | Column | Column | Column |
|---|---|---|---|---|---|---|
| 2 Fixing the base of the box Once the sensors are installed, you must place the base of pulling the SD-1000 sensor cable through the central hole Put the washers on the self-tapping screws and fi x the bo | the box, . x with them. |
Source page
Page 2
3 Cabling Measure and section the meters of corrugated tube and cable 4 Nut necessary to make a parallel connection between all the sensors and the measurement equipment. 3 Fitting You will need to put the cable (1) inside the corrugated tube (2). Place the union (3) at the end of the tube, and fi t into one of the lower holes in the box. Holding the union, tighten the nut (4) on the 2 Corrugated tube inside of the box. 1 Cell wire
4 Wiring Join the threads by colors by rolling them up, and later soldering them with tin.
Finally insert each wire into the connector as shown in the image below. The connection with the equipment will be indicated in the manual of said equipment.
Unit control
Cap Placement
Lastly, you will need to cover the connections with the box cap.
For more information Document Ref: D2161-01 www.dinacell.com Publication Date: 10/03/2023
Document editions